Completed

05.2019 y.
-
07.2019 y.
Construction of infrastructure facilities of the “National Industrial Petrochemical Technopark” special economic zone in Atyrau region (Karabatan and Tengiz sections). The project “External power supply”

06.2019 y.
-
07.2019 y.
Construction of infrastructure facilities of the “National Industrial Petrochemical Technopark” special economic zone in Atyrau region (Karabatan and Tengiz sections). The project “Construction of the on-site highway”

12.2019 y.
-
12.2021 y.
Construction of infrastructure facilities of the “National Industrial Petrochemical Technopark” special economic zone in Atyrau region (Karabatan and Tengiz sections). The project “Water treatment”

08.2021 y.
-
03.2022 y.
Medical center (polyclinic) with a hospital for 50 beds in Zhanaozen

02.2021 y.
-
08.2022 y.
Qazyna MRC on the Millennium Avenue, in Nur-Sultan

07.2022 y.
-
11.2022 y.
Multifunctional sports ground in Makat village of Makat district of Atyrau region

07.2022 y.
-
11.2022 y.
Multifunctional sports ground in Mukur village of Kyzylkoginsky district of Atyrau region

07.2022 y.
-
11.2022 y.